Roadmap
High-level program timeline. Detailed phase tables live under each initiative.Program phases
P5 may overlap the end of P3/P4 for inventory-driven stubs, but
supported exclusive rows still require a working engine.
I1 phase summary (ES Engine)
Full detail: ES phases.
I2 phase summary (Bun-exclusive)
Full detail: Bun roadmap.
I3 phase summary (Deno-exclusive)
Full detail: Deno roadmap.
Suggested calendar framing (not a promise)
A greenfield Zig ES engine that passes modern Test262 is a large effort. Phases exist so progress is continuous and claimable without faking parity.
Risks
After 0.0.1
Post-tag work (not this program’s exit bar):
- Shared Node / Deno / Bun overlap surfaces
- Framework dogfood (Next, Nuxt, Nest, Solid — equal priority)
- Embed depth for DX and yappy
- PM/CAS offline graphs
- Broader npm without adapters